san bernardino community college district

san bernardino, california

Picture - school.jpg

Crafton Hills College Campus - Parking, Access and Lighting Project/Science Portables - Swing Space Project: Under a sole sourced 3 year on-call survey contract and renewed for another 3 years in March 2012, CASC surveyors performed construction surveying for construction of parking lot and ADA pedestrian access walks through out the entire 10 campus parking lots.  Construction duration was 9 months.  Measure M Bond Budget: $13,900,000.00.

Crafton Hills College Campus - CRF LEED Solar Heating Panel Project: CASC surveyors performed aerial topographic mapping in support of the design of the now under construction design build Solar Farm which will supply the College with all of their electric needs year-round.  Measure M Bond Budget: $6,933,418.00.

Crafton Hills College Campus - New Student Center Project: CASC surveyors performed conventional topographic mapping and site survey in support of the design of the new Student Center.  Measure M Bond Budget: $31,857,211.00.

Crafton Hills College Campus - New Science Building Project: CASC surveyors performed conventional topographic mapping and site survey in support of the design of the new Science Building.  Measure M Bond Budget: $26,043,182.00.

Crafton Hills College Campus - New Occupational Education Building 2 Project: CASC surveyors performed conventional topographic mapping and site survey in support of the design of the new Occupational Education Building.  Measure M Bond Budget: $25,027,067.00.

Crafton Hills College Campus - New Physical Education Building Project: CASC surveyors performed conventional topographic mapping and site survey in support of the design of the new Physical Education Building.  Measure M Bond Budget: $3,529,706.00.